smart-me ASC and 3rd-party

E-mobility in the smart-me ASC with third-party charging stations

Description of the load management solution in the metering concept with third-party charging stations

When using third-party hardware, smart-me does not take care of load management. The manufacturer of the charging hardware offers its own measurement solution for control.

Within a smart-me ASC, it must be expected that meter hardware for control must be installed in addition to the smart-me meters for the calculation of the ASC at the points where the red arrows are located.

If, on the other hand, load management is not used by the respective manufacturer, but is solved via third-party software, the smart-me meters can also serve as a reference and source of information for the third-party hardware.

Smart-me metering hardware as a source of information for third-party software for controlling third-party charging stations:

Extended information on the load management of the Pico charging station

Parts list of superstructure

Documenatation of Pico load management system

Compatible 3rd-party load management systems


Accounting for e-mobility in an ASC

Billing can be carried out in different ways with their specific advantages and disadvantages: